Memorial Park Pump Station
- Company: Tauranga City Council
- Location: Tauranga
- Date: March 2016 - January 2017
+ Overview
CMS completed the Piping and Mechanical install with Brian Perry Civils completed the Civil works.
The purpose of the project was to complete the electrical and mechanical upgrade and associated structures required to pump wastewater flows from Memorial Park to Chapel Street WWTP and/or Te Maunga WWTP.
CMS completed the following:
- Supply and install of sewerage pressure pipeline system
- Supply and install of wastewater pressure pipeline system pumps, taps & valves
- Modifiy shoring panels
- Fabricate and install portal frames
CMS Project Supervisor
Dan Fong